Programming:
TIP ID Number Location
MES04-125C Country Club Dr: 8th Ave to Baseline Rd (including US-60 TI)
Work Description
Install real-time adaptive signal system
Modal Type Fiscal Year Federal Source Federal Cost Regional Cost Local Cost Total Cost
ITS 2009 CMAQ $788,810 $0 $581,190 $1,370,000
Design Review and Clearance Status
Tracs Number Federal Number Bid Date Bid Amount Project Closed Out
SS 563 03D&01C  CM-MES-0(027)A       
Design Concept Report: Environ. Clearance: Right-of-Way Clearance: Utilities Clearance: Design Status:
Approved 2/06 2006-02-15T00:00:00 Approved 4/06 2006-04-15T00:00:00     Plans at 100% 
History: Supplemental Information :
Deferred from 04 to 05 in 04 close out in 04-07 TIP, 6/23/04. Added to 04 with $788,810 CMAQ (construction phase of MES04-125, see also MES04-124D in 04) in Errata Sheet 04-05, 11/1/03.  12/08/08 ADOT Local Govt: Project could obligate at anty time